康泰嵩隆 · Design support for component selection
EKTShenzhen Kangtai Songlong Electronic Technology Co., Ltd.Electronic Components Manufacturer
Home / Design Center

Turn circuit requirements into a qualified shortlist

Use these engineering checklists to prepare a faster, clearer component review. EKT can support family selection, incumbent-part comparison, document requests and sample planning.

Start with requirements—not a guessed part number

Share the electrical stress, normal operating range, worst-case fault, temperature, mechanical limits, regulatory targets and annual demand. We will use that information to identify suitable product families and the specifications that still require confirmation.

Selection worksheets

Varistor & Surge Protection

Prepare continuous operating voltage, varistor voltage, surge waveform, peak current, energy, clamping target, package and environment.

MOVMLCVGDT
Open varistor guide →

TVS & ESD Protection

Define stand-off voltage, breakdown and clamping limits, pulse power, interface capacitance, polarity, package and qualification needs.

TVSESDSignal interface
Browse protection devices →

PPTC Resettable Fuses

Provide hold current, trip current, maximum voltage and fault current, trip-time target, ambient derating and PCB footprint.

0805120618122920
Open PPTC guide →

One-Time & Battery Fuses

Define rated current and voltage, breaking capacity, fast or time-lag response, pulse tolerance, package, approvals and operating temperature.

SMD fuseThree-terminal fuse
Open fuse guide →

NTC & PTC Thermistors

Prepare nominal resistance, B value or switching behavior, tolerance, temperature range, dissipation, response time and mechanical format.

Temperature sensingInrush limiting
Open thermistor guide →

Capacitors & Passive Parts

Specify capacitance, rated voltage, dielectric, tolerance, package size, temperature characteristic, frequency and application conditions.

MLCCCeramic capacitor
Browse capacitor families →

Technical support services

Cross-Reference Review

Submit the incumbent manufacturer and part number together with the parameters that cannot change. Equivalence is confirmed only after controlled datasheet comparison and testing.

Request cross-reference support →

Datasheet Request

Request the latest available controlled datasheet, dimension drawing and applicable quality documentation for the selected EKT series.

Request technical documents →

Sample & Qualification Plan

Tell us the application, sample quantity, evaluation schedule and required approvals so the right series and test priorities can be reviewed.

Discuss samples →

Recommended design workflow

STEP 01

Define

Record normal operation, the protection target and the failure mode to prevent.

STEP 02

Derate

Apply temperature, voltage, current, pulse and lifetime margins appropriate to the project.

STEP 03

Compare

Review package, performance, qualification, availability and controlled documentation.

STEP 04

Validate

Test samples in the final circuit under normal, abnormal and environmental conditions.

Ready to prepare a component shortlist?

Send your application, key parameters, incumbent part number and estimated annual quantity.

Send Requirements